Toledo Plant to Build Electronics Module for Jeep Hybrid
Fiat Chrysler Automobiles NV says the company’s machining facility in Toledo, Ohio, will produce the power electronics module for the plug-in hybrid variant of its new Jeep Wrangler SUV.
#hybrid #electronics
Fiat Chrysler Automobiles NV says the company’s machining facility in Toledo, Ohio, will produce the power electronics module for the plug-in hybrid variant of its new Jeep Wrangler SUV.
The module houses the power inverter and integrated dual charger module, which consists of the onboard charger and DC/DC converter. In the Wrangler, the power electronics unit will be packaged under the vehicle between the exhaust pipe and prop shaft.
Toledo Machining will assemble the sub-systems for the module, upload the applicable software for the power inverter and conduct final testing on the coolant and electrical systems. Finished modules will be delivered to Jeep’s nearby Toledo assembly complex, where the Wrangler PHEV will be built.
Due in 2020, the Wrangler PHEV will become one of more than 30 FCA nameplates with electrified powertrains that the company plans to launch by 2022. Jeep introduced the all-new conventional Wrangler—with gasoline and diesel engines—earlier this year.
RELATED CONTENT
-
Multiple Choices for Light, High-Performance Chassis
How carbon fiber is utilized is as different as the vehicles on which it is used. From full carbon tubs to partial panels to welded steel tube sandwich structures, the only limitation is imagination.
-
GM Develops a New Electrical Platform
GM engineers create a better electrical architecture that can handle the ever-increasing needs of vehicle systems
-
GM Seeks to Avert U.S. Plant Shutdowns Linked to Supplier Bankruptcy
General Motors Co. says it hopes to claim equipment and inventory from a bankrupt interior trim supplier to avoid being forced to idle all 19 of its U.S. assembly plants.