VW Plans $800 Million EV Factory in Tennessee
Volkswagen AG is building a second assembly plant adjoining its facility in Chattanooga, Tenn., to make electric vehicles beginning in 2020.
#hybrid
Volkswagen AG is building a second assembly plant adjoining its facility in Chattanooga, Tenn., to make electric vehicles beginning in 2020.
The $800 million factory will create 1,000 jobs, according to the company. The models it make will ride on VW’s new MEB chassis, which is designed specifically for electrics. The carmaker did not specify what model the new factory will make first or what the facility’s capacity will be.
VW plans to introduce its I.D. Crozz crossover vehicle (pictured) to the American market in 2020. A modern version of the company’s iconic Microbus, inspired by VW’s I.D. Buzz concept, is due in 2022.
VW Group reiterates that it expects to roll out 27 all-electric models by 2022 under a €44 billion ($50 billion) vehicle electrification push through 2023. The VW brand along aims for annual global EV sales of 150,000 units by 2020 and 1 million by 2025.
RELATED CONTENT
-
Robotic Exoskeleton Amplifies Human Strength
The Sarcos Guardian XO Max full-body, all-electric exoskeleton features strength amplification of up to 20 to 1, making 200 pounds—the suit’s upper limit—feel like 10 pounds for the user.
-
On The Jeep Grand Cherokee, 2022 Nissan Pathfinder, and More
An inside look at the Detroit Assembly Complex-Mack; a innovative approach to waste-free, two-tone painting; why a forging press is like an F1 car; and other automotive developments.
-
Toyota Updates Fuel Cell Test Truck
Toyota Motor Corp. unveiled an updated version of its Project Portal fuel cell-powered heavy-duty truck with reduced weight and increased driving range.