Renault’s New Trafic & the Eiffel Tower
As production costs around the world vary, global OEMs are shifting where they build products, often at the expense of long-time production sites where, essentially due to labor costs, things have become non-competitive.
#labor
As production costs around the world vary, global OEMs are shifting where they build products, often at the expense of long-time production sites where, essentially due to labor costs, things have become non-competitive. This is particularly the case in Western Europe.
They’ve installed 187 new robots in Sandouville to put 5,000 spot welds on the body of the New Trafic
So it is interesting to note that the Renault Sandouville plant, which is celebrating its 50th anniversary, which had been a passenger vehicle plant (it builds the Laguna and the Espace), has a product added to it, the New Trafic and Opel/Vauxhall Vivaro high-roof version light commercial vehicles.
The Trafic, of which Renault has sold more than 1.6-million since it was introduced in 1980, is, according to the company, available in 270 body versions and more than 100 colors (which sounds like a logistical nightmare).
One interesting factoid regarding the preparation for building the New Trafic in Sandouville: for the press tooling, 5,000 metric tons (or 5,512.5 tons) of cast iron were used, which Renault says is three quarters of the weight of the Eiffel Tower’s metal frame.
That’s a lot of die sets.
RELATED CONTENT
-
Double Disc Grinding in Automotive Parts Manufacturing
By John R. (Jay) DoubmanIn concept, not much has changed in double disc grinding since the invention of the machine in the 1890s.
-
What You Should Know About High-Speed Machining
The tools go a whole lot faster—40,000 rpm, perhaps—but the advantage is not parts per hour but in the ability to make precise parts with less induced stress
-
Advancing Manufacturing Tech—with Friction
As manufacturers are looking for process changes, friction welding can provide a great opportunity in production.