Bentley to Build New Engineering Center
Volkswagen Group's Bentley unit is building a new engineering center in Crewe, England, for emission testing and electrification technologies.
Volkswagen AG’s Bentley unit is constructing a new engineering center at its headquarters in Crewe, England.

Due to be completed next autumn, the 50,000 sq-ft facility initially will focus on fuel efficiency and emissions testing and developing electrification technologies. Bentley plans to offer an electrified variant of every vehicle in its lineup by 2023.
The new engineering center also will have a climate-controlled dynamometer that can simulate temperatures ranging from 14°F to more than 104°F.
Bentley’s 100-person Technical Conformity department will be based at the test center. The new building complements Bentley’s existing advanced research and development and training facilities at the Crewe complex.
RELATED CONTENT
-
On Fuel Cells, Battery Enclosures, and Lucid Air
A skateboard for fuel cells, building a better battery enclosure, what ADAS does, a big engine for boats, the curious case of lean production, what drivers think, and why Lucid is remarkable
-
Jeeps Modified for Moab
On Easter morning in Moab, Utah, when the population of that exceedingly-hard-to-get-to town in one of the most beautiful settings on Earth has more than doubled, some people won’t be hunting for Easter eggs, but will be trying to get a good look at one of the vehicles six that Jeep has prepared for real-life, fast-feedback from the assembled at the annual Easter Jeep Safari.
-
Increasing Use of Structural Adhesives in Automotive
Can you glue a car together? Frank Billotto of DuPont Transportation & Industrial discusses the major role structural adhesives can play in vehicle assembly.