Q4. What percentage of your 2010 capital
equipment expenditures will be invested in each of the listed
categories of machinery/equipment? |
| *NOTE: Total spending breakdown by major category. |
| |
2010 |
%Total Investment |
METALCUTTING
(See Metalcutting pie chart) |
$5,609 mil Total |
43.3 |
| |
New $3,612
Used $1,413
Rebuilt $584 |
|
| Broaching |
|
0.7 |
| Drilling/tapping |
|
3.1 |
Electrical discharge machining
(EDM—ram type) |
|
0.4 |
Electrical discharge machining
(EDM—wire type) |
|
2.5 |
Electrical discharge machining
(EDM—small hole) |
|
0.5 |
| Gearcutting/grinding |
|
2.3 |
| Grinding—flat/surface |
|
1.0 |
| Grinding—cylindrical/external |
|
1.3 |
| Grinding—creep feed |
|
0.5 |
| Grinding—ID/OD |
|
2.1 |
| Grinding—internal |
|
0.6 |
| Grinding—centerless |
|
0.8 |
| Grinding—other types |
|
0.6 |
Machining centers, horizontal
—400 mm pallet or below |
|
6.0 |
Machining centers, horizontal
—greater than 400 mm
pallet |
|
11.8 |
Machining centers, vertical
—20 inch Y and below |
|
8.3 |
Machining centers, vertical
—greater than 20 inch Y |
|
8.0 |
| Machining centers, waterjet |
|
1.4 |
| Milling/boring—horizontal |
|
7.7 |
| Milling—vertical |
|
3.4 |
| Sawing/cutoff |
|
1.6 |
| Turning, lathes horizontal or vertical —manual |
|
1.6 |
| Turning, lathes horizontal—CNC <10" chuck |
|
4.6 |
| Turning, lathes horizontal—CNC >10" chuck |
|
3.1 |
| Turning, lathes vertical —CNC |
|
4.0 |
| Turning centers, horizontal —CNC, < 10" chuck |
|
7.4 |
| Turning centers, horizontal —CNC, >10" chuck |
|
5.6 |
| Turning centers, vertical—CNC |
|
2.6 |
| Turning, screw machines (single, swiss & multi-spindle), automatic |
|
1.1 |
| Turning, screw machines (single, swiss & multi-spindle), CNC |
|
3.5 |
| Rotary transfer |
|
0.3 |
| Transfer machines and other special purpose |
|
1.6 |
METAL FORMING
(See Metal Forming pie chart) |
$1,321 mil Total |
10.2 |
| |
New $851
Used $333
Rebuilt $137 |
|
| Ironworkers |
|
1.8 |
| Press brakes |
|
15.3 |
| Stamping presses |
|
16.5 |
| Punch presses |
|
9.8 |
| Roll forming lines |
|
7.5 |
| Coil processing equipment |
|
3.2 |
| Shears |
|
3.0 |
| Laser cutting machines |
|
17.7 |
| Band saws |
|
3.3 |
| Thermal cutting machines |
|
5.8 |
| Waterjet cutting machines |
|
2.1 |
| Tube/pipe bending & forming machines |
|
10.6 |
| Tube/pipe production equipment |
|
3.4 |
| ASSEMBLY |
$2,086 mil Total |
16.1 |
| Synchronous automatic and semi-automatic |
|
41.1 |
| Non-synchronous automatic and semi-automatic |
|
19.4 |
| Portable power tools |
|
15.5 |
| Other assembly equipment |
|
24.0 |
| MATERIAL HANDLING |
$648 mil Total |
5.0 |
| Automated storage & retrieval systems (AS/RS) |
|
12.2 |
| Conveyors |
|
16.1 |
| Automated guided vehicles (AGVs) |
|
6.4 |
| Other |
|
55.3 |
| GAGING-INSPECTION-TESTING |
$946 mil Total |
7.3 |
| In-process gaging |
|
35.3 |
| Post-process gaging |
|
14.0 |
Coordinate measuring machines (CMMs)
—automatic, DCC |
|
12.6 |
Coordinate measuring machines (CMMs)
—manual |
|
7.5 |
| Testing |
|
20.7 |
| Vision systems |
|
9.9 |
| FINISHING EQUIPMENT |
$518 mil Total |
4.0 |
| Cleaning |
|
23.9 |
| Electroplating and anodizing |
|
9.2 |
| Painting |
|
31.4 |
| Deburring (vibratory finishing, polishing, buffing) |
|
15.5 |
| Powder coating |
|
7.8 |
| Air pollution control equipment |
|
6.7 |
| Water pollution control equipment |
|
5.5 |
| WELDING-RIVETING-BRAZING |
$518 mil Total |
4.0 |
| HEAT PROCESSING |
$220 mil Total |
1.7 |
| PLASTIC MOLDING |
$505 mil Total |
3.9 |
| OTHER |
$583 mil Total |
4.5 |
| For Example:
Computer Hardware &
Software
Injection Molding Equipment
Die Casting Equipment
Rubber Molding Equipment
Electronic Assembly
Semiconductors
Specialized Equipment
Tooling
Woodworking Equipment
Environmental Equipment
Facility Upgrade |